Construction of a new railway line to upgrade the existing one and building of new stations along the route

Requirement.

Preserving the structural integrity of existing buildings near the new line created to increase traffic flow.

Suggested solution.

In collaboration with SWS Engineering and FSE, the USM solution was chosen for this project, with the insertion of an anti-vibration mat MATRACK 20 AVC 600 between the substructure and the railway line.

Result.

The operation increased traffic flow and, thanks to the anti-vibration solutions adopted, also improved the acoustic and living conditions of residents living near the line.