•  
  • References
  • Italy
  • Railway
Bergamo - Albino tramway
  • Project data
  • Location: Bergamo
  • Year: 2006/2007
  • Customer: TEB (Tramvie Elettriche Bergamasche)
  • Office design:
  • Contractor: IPA Precast Spa
  • Product type: Matrack M25 AVC TB
Description:

Bergamo tramway,  line Bergamo - Albino, is the solution adopted in the ballast mat installation with the line Matrack with panel thikness of 25mm. In the photos below to see some stages of installation and construction of the line.